Case study

22.7 MWp Solar plant: a large-scale project delivered by our teams in France

  • CompanySiguesol
  • TypeGround Screws
  • ActivityStructures & Integrated Services
  • LocationFrance
  • Power22,7 MWc
  • Date2024

This 22.7 MWp project, delivered in France, demonstrates our ability to manage large-scale construction with discipline, technical expertise, and responsiveness. By adapting precisely to ground conditions, the installation is built on foundations engineered to ensure long-term stability and performance.

Project details

  • Location: France
  • Total installed power: 22.7 MWp
  • Foundation type: foundation screws
  • Date: 02 December 2024
  • Workforce: 30-person team

Site specifics

To standardise soil conditions and guarantee optimal stability, the project required foundation caps of 1,400 mm and 2,100 mm. This technical approach allowed us to adapt anchoring to ground variations and ensure structural consistency across the entire solar field.

Our response

SigueSol delivered a fully integrated scope, covering every phase of the project. With a 30-person team on site, we managed the operation with the precision and reliability that define our approach to large-scale installations.